- 270139 PRJ: Description of the MPX Project File Exchange Format Q270139 KB270139 January 25, 2021
- 141733 PRJ: How to Build a Hammock Task Q141733 KB141733 April 17, 2018
- 909913 Project Web Access cannot synchronize a user when you add a new resource from Active Directory in Project Professional 2003 Q909913 KB909913 January 14, 2015
- 317462 PRJ: Custom Data Does Not Appear in Resource Usage View Q317462 KB317462 January 10, 2015
- 256657 PRJ2000: Cannot Create External Link to a Project Stored in a Web Folder Q256657 KB256657 January 10, 2015
- 174760 PRJ: Task Features that Don't Apply to Split Tasks Q174760 KB174760 January 10, 2015
- 192024 PRJ: Expected Function or Variable Error When Using Add Method Q192024 KB192024 January 9, 2015
- 189868 PRJ: Error Running Macro That Opens Project Sharing Pool Q189868 KB189868 January 9, 2015
- 126943 PRJ: How to Use the GanttBarFormat Method Q126943 KB126943 January 9, 2015
- 256686 Project appears to stop responding when you change the update setting in the Links dialog box Q256686 KB256686 January 7, 2015
- 245861 PRJ2000: Network Diagram Task Box Prints Across Pages Q245861 KB245861 January 7, 2015
- 314585 PRJ2000: Error Message When You Try to Enter a Task in Microsoft Project: The Value Is Not Valid Q314585 KB314585 January 6, 2015
- 312608 PRJ2000: Tasks Are Not Grouped Properly When You Group Them By Resource Names Q312608 KB312608 January 6, 2015
- 245859 PRJ: Problems with Copy or Paste in Network Diagram Q245859 KB245859 January 6, 2015
- 173764 PRJ: Clearing Actual Work Changes Value to 0 Instead of Blank Q173764 KB173764 January 6, 2015
- 171396 PRJ: % Complete Not Updated for Inserted Projects Q171396 KB171396 January 6, 2015
- 256711 PRJ2000: Material Resource Changes to Work Resource if You Copy a Task Between Files Q256711 KB256711 January 5, 2015
- 199648 PRJ: Crosstab Report Filters Applied to Tasks and Resources Q199648 KB199648 January 5, 2015
- 175008 PRJ98: Unit of Time Included when Pasting Timescaled Work Q175008 KB175008 January 5, 2015
- 173160 PRJ: Unable to Quit Project When Low on Virtual Memory Q173160 KB173160 January 5, 2015
- 838024 Previously submitted actual work may shift after a project plan is updated in Microsoft Office Project 2003 Q838024 KB838024 December 31, 2014
- 187377 PRJ: Crosstab Report May Display Rounding Errors Q187377 KB187377 December 29, 2014
- 245843 PRJ: Start Or Finish Date Changed When Typing A New Date In Network Diagram or Task Form View Q245843 KB245843 December 28, 2014
- 242654 PRJ: Cannot Filter on Group Summary Values Q242654 KB242654 December 28, 2014
- 197105 PRJ: Tasks Not Sorted as Expected When Blank Tasks Exist Q197105 KB197105 December 28, 2014
- 196130 PRJ: Creating a New Split Reschedules Existing Split Q196130 KB196130 December 28, 2014
- 173329 PRJ: Actual Work Lost Moving, Replacing Resource Assignment Q173329 KB173329 December 28, 2014
- 171055 PRJ: Start Date Changes After Adding Delay, Actual Work Q171055 KB171055 December 28, 2014
- 170705 PRJ: Can't Open Resource Assignment Dialog Box If Already Open Q170705 KB170705 December 28, 2014
- 171394 PRJ: Task Split Information Not Saved When Using Work Contour Q171394 KB171394 December 27, 2014
- 172727 PRJ: Unicode Characters Lost Exporting to .txt, .csv, .htm Q172727 KB172727 December 23, 2014
- 170630 PRJ: Data with Spaces Treated as Separate Entry in AutoFilter Q170630 KB170630 December 23, 2014
- 45695 PRJ: Setting Calendar Working Hours for Evening/Night Shift Q45695 KB45695 June 7, 2013
- 245863 PRJ2000: #ERROR Value in a Cell Q245863 KB245863 April 29, 2013
- 141262 PRJ: Zoom In and Zoom Out Buttons Change Timescale Q141262 KB141262 April 29, 2013
- 126105 PRJ: Auto_Open and Auto_Close Macros Q126105 KB126105 April 29, 2013
- 124482 PRJ: Macro to Sum Values in Filtered List Q124482 KB124482 April 29, 2013
- 64231 PRJ: Prorating Fixed Costs in Project for Windows Q64231 KB64231 April 29, 2013
- 169597 Proj: How Work and Duration are Calculated w/Assignment Changes Q169597 KB169597 April 26, 2013
- 128622 PRJ: Running a Macro Automatically When You Start MS Project Q128622 KB128622 April 26, 2013
- 209115 PRJ98: How to Calculate the Schedule and Cost Performance Index Q209115 KB209115 March 26, 2013
- 245847 Progress bars not drawn for tasks that are in progress in Project Q245847 KB245847 March 22, 2013
- 958962 Project 2003 crashes when you expand many subprojects in a master project Q958962 KB958962 October 9, 2011
- 141654 PRJ: How to Print Specific Tasks from a View Q141654 KB141654 September 19, 2011
- 131569 PRJ: Cannot Open Global Template File Q131569 KB131569 September 19, 2011
- 126815 Pasting text to the Notes field overwrites notes in following rows in Microsoft Project Q126815 KB126815 September 19, 2011
- 113309 PRJ: Err: "Disk Is Full" When Disk Has Plenty of Disk Space Q113309 KB113309 September 19, 2011
- 103201 PRJ: BCWS Incorrect If Fix Cost Deleted After Plan Set Q103201 KB103201 September 19, 2011
- 100647 Pasting Microsoft Project tables into Microsoft Word Q100647 KB100647 September 19, 2011
- 86287 PRJ: How Fiscal Dates Are Shown on a Timescaled View Q86287 KB86287 September 19, 2011
- 75845 PRJ: Gridline Formats Print Differently Than Displayed Q75845 KB75845 September 19, 2011
- 60989 PRJ: Pasting Information into Project from Another Application Q60989 KB60989 September 19, 2011
- 832395 "Project Encountered a Problem and Needs to Close" Error Message and Microsoft Project Quits Unexpectedly (Crashes) When You Save Your Project to Project Server Q832395 KB832395 September 18, 2011
- 245937 PRJ2000: Leveling Error Message Does Not Reflect Correct Time Q245937 KB245937 September 18, 2011
- 245876 PRJ: Text Drawn in Front of Other Objects When Printed or Previewed Q245876 KB245876 September 18, 2011
- 245858 PRJ2000: Assignment Units Changed When You Replace a Resource Q245858 KB245858 September 18, 2011
- 242677 PRJ2000: Hyperlinks Not Underlined or Colored in Network Diagram View Q242677 KB242677 September 18, 2011
- 242627 PRJ2000: Error Messages from Features Not Supported in Web Folders Q242627 KB242627 September 18, 2011
- 242622 PRJ2000: Error Inserting Project, Creating Predecessor, Successor, or New Window Q242622 KB242622 September 18, 2011
- 239525 PRJ98-2003: How to Include a GIF Image When You Save a Project as HTML Q239525 KB239525 September 18, 2011
- 216495 PRJ98: Macro to Determine If a Project Is Opened as Read-Only Q216495 KB216495 September 18, 2011
- 198353 PRJ: Missing Symbols and Timescale in Inserted Project Object Q198353 KB198353 September 18, 2011
- 197552 PRJ: Gantt Bars Not Rounded to Full Minor Timescale Unit Q197552 KB197552 September 18, 2011
- 197353 PRJ: Leading Split/Zero Work Removed When Assigning Resource Q197353 KB197353 September 18, 2011
- 197333 PRJ: Outline Levels Lost When Dragging Summary into Subtasks Q197333 KB197333 September 18, 2011
- 196144 PRJ: Unexpected Time Displayed in ScreenTip When Drag Task Bar Q196144 KB196144 September 18, 2011
- 195524 PRJ: Milestone Task Has Incorrect Finish Q195524 KB195524 September 18, 2011
- 195358 PRJ: Path or URL Not Changed into Hyperlink Automatically Q195358 KB195358 September 18, 2011
- 195350 PRJ98: Filter Dialog Box Redisplayed After You Click OK Q195350 KB195350 September 18, 2011
- 195148 PRJ: Icon Displayed for Preview in File Open Dialog Box Q195148 KB195148 September 18, 2011
- 194969 PRJ98: Error Message When Renaming Calendar Named Standard Q194969 KB194969 September 18, 2011
- 193314 Picture appears larger or smaller than expected when you paste a picture that was copied in Project Q193314 KB193314 September 18, 2011
- 193148 PRJ: WMF Images Inserted in Header-Footer-Legend Are Too Large Q193148 KB193148 September 18, 2011
- 189863 PRJ: Missing Or Incorrect Object When Print Or Preview Report Q189863 KB189863 September 18, 2011
- 189263 PRJ: Tasks Not Rescheduled When You Link an Inserted Project Q189263 KB189263 September 18, 2011
- 182897 PRJ98: Gridlines Do Not Print On Brother MFC 4500 ML Printer Q182897 KB182897 September 18, 2011
- 182272 PRJ: Start-to-Finish Dependency Causes Unexpected Finish Date Q182272 KB182272 September 18, 2011
- 179781 PRJ: Changing Percent Complete Causes Delay or Schedule Error Q179781 KB179781 September 18, 2011
- 179780 PRJ: Missing Information in Details of Usage Views Q179780 KB179780 September 18, 2011
- 178701 PRJ: The Resource Does Not Exist Error When Assigning Resource Q178701 KB178701 September 18, 2011
- 178700 PRJ: Unexpected Value in Actual Overtime Cost and Overtime Cost Q178700 KB178700 September 18, 2011
- 178310 PRJ: Error Message Indicating Nonworking Time When Moving a Task Q178310 KB178310 September 18, 2011
- 178184 PRJ: Task Moves Unexpectedly When Dragging a Task to a New Date Q178184 KB178184 September 18, 2011
- 177019 PRJ: Cannot Delete % Complete in Task Usage View Q177019 KB177019 September 18, 2011
- 176291 PRJ: Task with Finish-Finish Predecessor Scheduled Incorrectly Q176291 KB176291 September 18, 2011
- 175458 PRJ: How to View Resource Availability Across a Resource Pool Q175458 KB175458 September 18, 2011
- 175034 PRJ: How to Determine a Task's Source in a Consolidated Project Q175034 KB175034 September 18, 2011
- 174982 Project may not close when you exit Project if you use OLE links between Project and Excel Q174982 KB174982 September 18, 2011
- 173763 PRJ: Incorrect Date Format After Converting to MPX, TXT or CSV Q173763 KB173763 September 18, 2011
- 173746 Problems with setting PercentComplete property when using Project Q173746 KB173746 September 18, 2011
- 173263 PRJ: Incorrect Start Date for Inserted Project Q173263 KB173263 September 18, 2011
- 172904 PRJ98: Links Change After Pasting Link Between Linked Tasks Q172904 KB172904 September 18, 2011
- 172893 PRJ: Setting Task to 0% or 100% Complete Updates Resource Status Q172893 KB172893 September 18, 2011
- 172890 PRJ: Wrong Result Linking Task, Resource w/ Identical Names Q172890 KB172890 September 18, 2011
- 172792 PRJ: Progress Line Appears in Wrong Row for Milestone Task Q172792 KB172792 September 18, 2011
- 172783 PRJ: BCWP for Resource Assignment Different from BCWP for Task Q172783 KB172783 September 18, 2011
- 171395 PRJ: Paste Linked Date Field Different from Source Date Field Q171395 KB171395 September 18, 2011
- 171391 PRJ: How Resource Assignment Delay Affects Task Start, Finish Q171391 KB171391 September 18, 2011
- 171060 PRJ: DateAdd and DateDifference Methods Don't Work Q171060 KB171060 September 18, 2011
- 170710 PRJ: Open Event Disabled When Opening a Project from Hyperlink Q170710 KB170710 September 18, 2011
- 169728 PRJ: AutoCorrect Doesn't Work When Entering Note Information Q169728 KB169728 September 18, 2011
- 169384 PRJ: CTRL+F4 (FileClose) Not Recorded in VBA Macro Q169384 KB169384 September 18, 2011
- 169238 PRJ: New Tasks Added as Subtasks When Using Inserted Projects Q169238 KB169238 September 18, 2011
- 160641 PRJ: Unable to Use Drawing Tools Q160641 KB160641 September 18, 2011
- 159773 PRJ: Project Lag Uses Base Calendar Instead of Resource Calendar Q159773 KB159773 September 18, 2011
- 145852 PRJ: "User-Defined Type Not Defined" Error in Macro Q145852 KB145852 September 18, 2011
- 139837 PRJ: "Run-Time Error" If File Name Extension Not Included Q139837 KB139837 September 18, 2011
- 139539 PRJ: "Tasks Starting Soon" Report Displays Tasks in Progress Q139539 KB139539 September 18, 2011
- 137744 PRJ: Macro to Identify a Task's Driving Resources Q137744 KB137744 September 18, 2011
- 137673 PRJ: Using DateDifference to Calculate Planned % Complete Q137673 KB137673 September 18, 2011
- 137543 PRJ: Can't Format Bar with Bar Command If Multiple Styles Exist Q137543 KB137543 September 18, 2011
- 137542 PRJ: Clearing a Text Field Clears the Notes Field Q137542 KB137542 September 18, 2011
- 136428 Progress bar in Microsoft Project is not shown correctly for tasks with resources Q136428 KB136428 September 18, 2011
- 136028 PRJ: Unable to Print OLE Object to HP-GL Plotter Q136028 KB136028 September 18, 2011
- 128621 PRJ: Minimize Argument in AppExecute Does Not Work Q128621 KB128621 September 18, 2011
- 126941 PRJ: Creating a Multi-Line Filter Using the FilterEdit Method Q126941 KB126941 September 18, 2011
- 124627 PRJ: Column Widths in Reports Appear Different on Screen Q124627 KB124627 September 18, 2011
- 124032 PRJ: How Microsoft Project Sorts Text Fields Q124032 KB124032 September 18, 2011
- 123359 PRJ: Consolidated Project Summary Task Not Displayed Correctly Q123359 KB123359 September 18, 2011
- 123025 PRJ: VB Code to Find Blank Rows in Task or Resource Sheet Q123025 KB123025 September 18, 2011
- 120060 PRJ: Not Enough Printable Space When Printing a Report Q120060 KB120060 September 18, 2011
- 119778 PRJ: Using Visual Basic Print Method Without Displaying Dialog Box Q119778 KB119778 September 18, 2011
- 118689 PRJ: Rolling Up Cost Fields to the Summary Level Task Q118689 KB118689 September 18, 2011
- 115098 PRJ: Cannot Use 24:00 as a Valid Time Q115098 KB115098 September 18, 2011
- 113816 PRJ: Timescale Selection Changes with Zoom in Resource Usage Q113816 KB113816 September 18, 2011
- 113778 PRJ: HP Plotters Print Light Gray as Blue Color Q113778 KB113778 September 18, 2011
- 113772 PRJ: FilterApply Method Fails with Two Interactive Dialog Boxes Q113772 KB113772 September 18, 2011
- 113769 PRJ: Task Bar Appears on Top of Other Tasks in Calendar View Q113769 KB113769 September 18, 2011
- 113725 PRJ: Task Bar Prints with Blank Rows in Calendar View Q113725 KB113725 September 18, 2011
- 113694 PRJ: Resource Cost May Increase When Leveling Q113694 KB113694 September 18, 2011
- 113652 PRJ: Changing Recurring Task Frequency Moves Nonrecurring Task Q113652 KB113652 September 18, 2011
- 113650 PRJ: Original Name Remains on Menu after Renaming View Q113650 KB113650 September 18, 2011
- 113609 PRJ: Sized Object Returns to Original Size After Paste or Edit Q113609 KB113609 September 18, 2011
- 113489 PRJ: Drawing Objects Change Position When Printed Q113489 KB113489 September 18, 2011
- 113465 PRJ: Edited Recurring Task Start Date Changes Back to Original Q113465 KB113465 September 18, 2011
- 113447 PRJ: Scheduling a Project Based on a Task Start Date Q113447 KB113447 September 18, 2011
- 113362 PRJ: Custom Report Changes Are Not Recorded Q113362 KB113362 September 18, 2011
- 113359 PRJ: Prompt to Save Changes Even If No Changes Made Q113359 KB113359 September 18, 2011
- 113338 PRJ: Gantt Bar Names Truncated to First 51 Characters Q113338 KB113338 September 18, 2011
- 113312 PRJ: Can't Enter Duration in Replace Resource Dialog Box Q113312 KB113312 September 18, 2011
- 113202 PRJ: Nonworking Time, Format for Timescale Change Unexpectedly Q113202 KB113202 September 18, 2011
- 113155 PRJ: Milestone Task Bar Shows as Entire Day in Calendar View Q113155 KB113155 September 18, 2011
- 113132 PRJ: First Instance of Resource Name Assigned to Task Q113132 KB113132 September 18, 2011
- 112998 PRJ: Undo Command Unavailable with Large Number of Tasks/Resources Q112998 KB112998 September 18, 2011
- 112994 PRJ: Macro Recorder Does Not Record Window Commands Q112994 KB112994 September 18, 2011
- 101342 PRJ: Unwanted Blank Tasks Printed in Task View Q101342 KB101342 September 18, 2011
- 99585 PRJ: System Date Causes Incorrect Current Date Q99585 KB99585 September 18, 2011
- 98903 PRJ: Changing Calendars That Have Calendar Exceptions Q98903 KB98903 September 18, 2011
- 96782 PRJ: Notes Header and Underline Do Not Print Q96782 KB96782 September 18, 2011
- 87301 PRJ: How Elapsed Duration Tasks Affect Slack Calculations Q87301 KB87301 September 18, 2011
- 84314 PRJ: Using Summary Tasks in Task Relationships Q84314 KB84314 September 18, 2011
- 84290 PRJ: Unexpected Start Date Used for Goto Overallocation Q84290 KB84290 September 18, 2011
- 84178 PRJ: Visual Merge Lists Projects in Alphabetical Order Q84178 KB84178 September 18, 2011
- 83908 PRJ: How to Globally Change the Resource Allocation Units Q83908 KB83908 September 18, 2011
- 81762 PRJ: Filtering on the Resource Name Column Q81762 KB81762 September 18, 2011
- 77506 PRJ: Cumulative Work and Cost Extend to 12/31/2049 Q77506 KB77506 September 18, 2011
- 75674 PRJ: Adding New Tasks to a Project Already in Progress Q75674 KB75674 September 18, 2011
- 70898 PRJ: How Microsoft Project Displays Overlapping Gantt Bars Q70898 KB70898 September 18, 2011
- 63477 PRJ: How to Set up a Negative Slack Filter in MS Project Q63477 KB63477 September 18, 2011
- 44657 PRJ: Duration Units Don't Update with Change in Defaults Q44657 KB44657 September 18, 2011
- 36561 PRJ: Filtering Criteria Supported by Project Q36561 KB36561 September 18, 2011
- 830420 Project 2003 quits unexpectedly when you select an item in the drop-down list Q830420 KB830420 September 13, 2011
- 2000182 Physical % Complete on Summary level shows as 0% Q2000182 KB2000182 August 4, 2009
- 832288 Products that qualify for the Office 2003 upgrade Q832288 KB832288 March 27, 2007
- 170704 Percent Complete not correct for task with multiple resources Q170704 KB170704 January 20, 2007